1. Home
  2. /
  3. case
  4. /
  5. Inspection of 5 Cross-river...

Inspection of 5 Cross-river Bridges on High-grade Waterways


Underwater Inspection of Cross-river Bridges

-60%
Inspection Time

-70%
Related Costs

An advanced underwater inspection robot has been successfully applied to the detection of five cross-river bridges on high-grade waterways, achieving remarkable efficiency gains compared with traditional diver-based inspections.

Bridge Infrastructure Scope

  • Timeline: Bridges built between 1932 and 2003.
  • Length Variation: Ranging from 356 meters to 1130 meters.
  • Scale: Multiple structures stretching approximately 1000 meters.

Scroll to Top